Quality management of post-grouting for bored cast-in-place pile on passenger dedicated line based on PDCA cycle


Abstract:
In order to ensure the construction quality of post-grouting for bored pile of passenger dedicated line viaduct, to meet the requirement of foundation settlement for ballastless track laying, and to realize the precision management of multiple factors such as manual, material, equipment, external environment and on-site supervision, the management model of planning-do-check-action (PDCA) cycle is put forward to reduce rework and improve economic efficiency. By analyzing the influence factors of the post grouting quality, we formulate the corrective project management. The excellent rate of post-grouting increases from 78% to 100% through twice PDCA cycle management. The results of project quality management show that when the grouting is 70% of total amount, the gap of pressure and grouting can be reduced by adjusting the water-cement ratio according to pressure. When the pressure value is lower than the setting pressure (3.2 MPa at the pile end and 2.5 MPa on the pile side), the water-cement ratio can be reduced, on the contrary, it should be appropriately increased. The normal opening rate of grouting valve can be improved by arranging corrugated steel wire tube at the outside of grouting bottom valve and the side valve tube with flower arrangement. The pipeline rupture and joint detachment phenomenon caused by grouting pressure changes can be solved through adding pressure control switch and three links in the grouting pump circuit system. The results provide an important reference on how to realize the delicacy management by introducing the PDCA cycle in the large-scale transportation civil engineering.

Key words:bridge engineering,passenger dedicated line,post-grouting technology,planning-do-check-action cycle,quality management,comprehensive good rate

ReleaseDate:2018-03-20 15:26:57



[1] 孙秀昌,李岩冰,刘江峰. PDCA循环在企业安全管理中的应用探讨[J].中国安全生产科学技术, 2008, 4(1):132-135. SUN Xiuchang, LI Yanbing, LIU Jiangfeng. Discussion on application of deming PDCA cycle in enterprise safety management[J]. Journal of Safety and Technology, 2008, 4(1):132-135.(in Chinese)

[2] 夏新瑞,乐业清. PDCA循环在高温差地区混凝土预制方块质量控制中的应用[J].混凝土, 2015, 307(5):124-127. XIA Xinrui, LE Yeqing. Application of PDCA cycle in precast concrete block quality control in high temperature difference area[J]. Concrete, 2015, 307(5):124-127.(in Chinese)

[3] 姚学健,温国梁,付晓丽,等. PDCA循环理念提高水工混凝土耐久性措施的研究[J].水利水电技术, 2008, 39(4):66-72. YAO Xuejian, WEN Guoliang, FU Xiaoli, et al. Study on measures to enhance durability of hydraulic concrete based on PDCA recycle principle[J]. Water Resources and Hydropower Engineering, 2008, 39(4):66-72.(in Chinese)

[4] 熊国斌. PDCA循环控制法在雅泸高速公路路基填筑质量控制中的应用[J].铁道科学与工程学报, 2010, 7(6):69-74. XIONG Guobin. Application study on PDCA circulation in the quality control of subgrade filling for ya'an-lugu expressway[J]. Journal of Railway Science and Engineering, 2010, 7(6):69-74.(in Chinese)

[5] 徐永明,王继荣. PDCA循环法在公路施工质量控制中的应用[J].人民长江, 2010, 41(5):55-57. XU Yongming, WANG Jirong. Application of PDCA circulation method in quality control of highway construction[J]. Yangtze River, 2010, 41(5):55-57.(in Chinese)

[6] 凌立新. PDCA循环在水泥路面施工中的应用[J].公路工程, 2011, 36(2):141-156. LING Lixin. Application of PDCA cycling theory in cement road surface construction[J]. Highway Engineering Science and Engineering, 2011, 36(2):141-156.(in Chinese)

[7] 章勇武,马国丰,尤建新. 基于PDCA的隧道施工进度柔性控制[J].地下空间与工程学报, 2005, 1(5):733-736. ZHANG Yongwu, MA Guofeng, YOU Jianxin. Flexible control of tunnel construction schedule based on PDCA[J]. Chinese Journal of Underground Space and Engineering, 2005, 1(5):733-736.(in Chinese)

[8] 宋天田. 地铁盾构隧道的PDCA质量管理[J].现代隧道技术, 2010, 47(2):24-62. SONG Tiantian. Quality management based on PDCA method in metro shield tunnel[J]. Modern Tunneling Technology, 2010, 47(2):24-62.(in Chinese)

[9] 王磊. PDCA在标准贯入试验质量管理中的应用[J].水文地质工程地质, 2012, 39(2):85-87. WANG Lei. Application of PDCA to the quality management of standard penetration test[J]. Hydrogeology and Engineering Geology, 2012, 39(2):85-87.(in Chinese)

[10] 孟宪魁. PDCA风险管理在工程施工中的应用[J].铁道工程学报, 2006(4):101-104. MENG Xiankui. Application of PDCA risk management in construction[J]. Journal of Railway Engineering Society, 2006(4):101-104.(in Chinese)

[11] 万元林,张赛. PDCA循环在建设项目成本管理中的应用[J].施工技术, 2013,42(S1):340-342. WAN Yuanlin, ZHAN Sai. The application of PDCA cycle in the construction project cost management[J]. Construction Technology, 2013,42(S1):340-342.(in Chinese)

[12] 邓祥辉,张永杰,房海勃. 后压浆钻孔灌注桩承载力分析与试验研究[J].建筑科学与工程学报, 2015,32(2):58-64. DENG Xianghui, ZHANG Yongjie, FANG Haibo. Bearing capacity analysis and experiment research on post-grouting bored piles[J]. Journal of Architecture and Civil Engineering, 2015,32(2):58-64.(in Chinese)

[13] 李洪江,董立元,刘松玉,等. 后注浆超长灌注桩水平承载特性现场试验研究[J].建筑结构学报, 2016,37(6):204-211. LI Hongjiang, DONG Liyuan, LIU Songyu, et. Experiment study on lateral bearing behavior of post-grouting super-long bored pile[J]. Journal of Building Structures, 2016,37(6):204-211.(in Chinese)

[14] 黄丽娟,高兰芳. 不同地质后注浆钻孔灌注桩承载力试验研究[J].公路交通科技, 2017,34(10):74-82. HUANG Lijuan, GAO Lanfang. Experiment study on bearing capacity of post-grouted bored piles under different geological conditions[J]. Journal of Highway and Transportation Research and Development, 2017,34(10):74-82.(in Chinese)

[15] 万志辉,戴国亮,龚维明,等.基于自平衡法后压浆灌注桩荷载传递函数的变化分析[J].土木工程学报, 2017,50(8):98-104. WAN Zhihui, DAI Guoliang, GONG Weiming, et al. Analysis on the load transfer function of post-grouting bored pile based on self-balanced method[J]. China Civil Engineering Journal, 2017,50(8):98-104.(in Chinese)

[16] 王文渊, 刘彬源, 李贺,等. 超长灌注桩桩端桩侧复式后注浆施工技术[J]. 施工技术, 2017(21):117-124. WANG Wunyuan, LIU Binyuan, LI He, et al. Construction of pile-end and pile-side reciprocating post-grouting for super-long bored pile[J]. Construction Technology, 2017(21):117-124.(in Chinese)

[17] 文石命. 后注浆钻孔灌注桩质量事故分析与处理[J].四川建筑科学研究, 2015, 41(2):99-101. WEN Shiming. Analysis and treatment of quality accident of post grouting bored pile[J]. Sichuan Building Science, 2015, 41(2):99-101.(in Chinese)

[18] 王艳, 尹骥. 桩端后注浆有效注浆量计算方法的探讨[J].地下空间与工程学报, 2016,12(3):789-794. WANG Yan, YIN Ji. Disscussion on calculation method of effective grouting volume of pile-end post-grouting[J]. Chinese Journal of Underground Space and Engineering, 2016,12(3):789-794.(in Chinese)