TBM Cutting Tools Maintenance Technology for the Yellow River Crossing Project in the Middle Route of South-to-North Water Diversion Project


Abstract:
The geological conditions of the Yellow River Crossing Project in the Middle Route of South-to-North Water Diversion Project are complicated,for the crossing tunnel strata consists of total sandy layer,total earth layer,upper sand and lower earth layers mixed.In the design of cutter head for shielding machine,soft soil cutting tool and heavy-load cutter head force-transmitting frame were applied to protect the cutting tools.However,during the TBM construction,the facts of abnormal excavating parameters and mucking containing metalwork demonstrated that the TBM cutting tools were severely wearing.By chamber-entering check under pressure,we found out problems and replaced some damaged cutting tools.After the foundation reinforcement,we made a thorough rehabilitation on the cutters needed to be repaired by the scheme of chamber-entering under normal pressure.This maintenance experience can provide an important guide for smooth progress of the Yellow River Crossing project,and a reference for similar projects.

Key words:Yellow River Crossing Tunnel,TBM construction,cutting tools,wearing,chamber-entering check under pressure,chamber-entering under normal pressure,foundation reinforcement,maintenance

ReleaseDate:2014-07-21 15:58:50



[1] 王江涛,陈建军,吴庆红,等.南水北调中线穿黄工程泥水盾构施工技术[M].郑州:黄河水利出版社,2006.(WANG Jiang-tao,CHEN Jian-jun,WU Qing-hong,et al.South-to-North Water Transfer Project Sturry in Yellow Shield Construction Technology[M].Zhengzhou:The Yellow River water conservancy press,2006.(in Chinese))

[2] 于澎涛.南水北调中线穿黄隧洞盾构机选型问题探讨[A].地下工程建设与环境和谐发展[C].上海:同济大学出版社,2009:248-255.(YU Peng-tao.Underground Construction Evolved in Harmony with Environment Protection[A].The Underground Engineering Construction Harmonious Environment and Development[C].Shanghai:Tongji University Press,2009:248-255.(in Chinese))〖JP〗

[3] 于澎涛.南水北调中线穿黄隧洞盾构始发技术[J].南水北调与水利科技,2008,6(4):54-57.(YU Peng-tao.Startingup Construction Technology with Shield Machine in the Yellow River Crossing Tunnel of the Middle Route Project of South-to-North Water Diversion [J].South-to-North Water Tranfers and Water Science & Technology,2008,6(4):54-57.(in Chinese))

[4] 张凤祥,朱合华,傅德明.盾构隧道[M].北京:人民交通出版社,2008.(ZHANG Feng-xiang,ZHU He-hua,FU De-ming.Shield Tunnelling Method[M].Beijing:China Communication Press,2008.(in Chinese))

[5] 刘远书,于澎涛,段瑞瑞.盾构施工技术及其在南水北调中线穿黄工程中的应用[J].水利技术监督,2009,91(5):10-12.(LIU Yuan-shu,YU Peng-tao,DUAN Rui-rui.Shield Driving Technology and its Application in Yellow River Crossing Works of the Middle Scheme of South-North Water Transfer Project[J].Technical Supervision in Water Resources,2009,91(5):10-12.(in Chinese))

[6] 刘远书,孙甲,郝清华.SMW工法在南水北调中线穿黄工程盾[JP2]构机常压换刀时地基加固中的应用[J].水利水电技术,2009,40(11):84-87.(LIU Yuan-shu,SUN Jia,HAO Qing-hua.Application of SMW Construction Method to Foundation Reinforcement During Cutter-changing of Shield Machine under Normal Pressure in Con-struction of Yellow River Crossing of South-to-North Water Transfer Project[J].Water Resources and Hydropower Engineering,2009,40(11):84-87.(in Chinese))

[7] 陈曦川.南水北调中线穿黄工程隧洞盾构施工规律的探讨[J].南水北调与水利科技,2010,8(4):152-154.(CHEN Xi-chuan.Discussion on Shield Construction Rules of the Yellow River-Crossing Tunnel in the Middle Route of the South-North Water Diversion Project [J].South-to-North Water Tranfers and Water Science & Technology,2010,8(4):152-154.(in Chinese))

[8] 周文波.盾构法隧道施工技术及应用[M].北京:中国建筑工业出版社,2004.(ZHOU Wen-bo.Shield Tunnelling Technology[M].Beijing:China Architecture & Building Press,2004.(in Chinese))

[9] 于澎涛.南水北调中线穿黄隧洞关键技术问题研究[J].中国水利,2006,(20):29-31.(YU Peng-tao.Key Technology Research of Yellow River Crossing Tunnel Construction of South-to-North Water Diversion Middle Route Project[J].China Water Resources,2006,(20):29-31.(in Chinese))