doi:

DOI: 10.3724/SP.J.1201.2011.01050

South-to-North Water Diversion and Water Science & Technology (南水北调与水利科技) 2011/9:1 PP.50-52

Experimental Study on the Impacts of Culverts Crossing the River with Two Different Sections on Riverbed Erosion and Deposition Deformation


Abstract:
In order to investigate the different impacts of arc-shaped cross-section and trapezoidal cross-section culvert crossing the river on upstream water level and riverbed deformation,a physical model test is used to measure water level along the river and riverbed erosion and deposition deformation near culverts.The results show that backwater in the upstream of the arc-shaped culvert is bigger than trapezoidal culvert,while local erosion and deposition of river bed is less than trapezoidal culvert.Particularly,the scour downstream trapezoidal culvert is much more serious than that downstream arc-shaped culvert when three-year return period flood is coming.Therefore,stilling basin downstream the culvert should be constructed according to the form of the culvert,and arc-shaped culvert is more appropriate than trapezoidal culvert in the Zhang River where the annual runoff is close to the three-year return period flood flow.

Key words:section shape,river node,culvert,erosion and deposition deformation

ReleaseDate:2014-07-21 15:58:57



[1] 胡一三.节点议[J].人民黄河,2002,24(4):13-14.(HU Yi-san.Node considered [J].Yellow River,2002,24(4):13-14.(in Chinese))

[2] 曲同祥.漳河节点工程作用探析[J].河北工程技术高等专科学校学报,2005,(1):38-39.(QU Tong-xiang.Rode of Zhanghe River[J].Journal of Hebei Engineering and Technical College,2005,(1):38-39.(in Chinese))

[3] 裴杰峰.穿漳涵洞工程稳定性分析[J].海河水利,2007,(4):56-58.(PEI Jie-feng.Stability Analysis of Culvert Crossing Zhanghe River[J].Haihe Water Resources,2007,(4):56-58.(in Chinese))

[4] 钱宁,万兆惠.泥沙运动力学[M].北京:科学出版社,2003:15-18.(QIAN Ning,WAN Zhao-hui.Sediment Transport Mechanics[M].Beijing:Science Press,2003:15-18.(in Chinese))

[5] 尹健梅,程伍群,严磊,等.滦河迁西县城段河工模型试验的模型沙设计[J].南水北调与水利科技,2008,6(2):42-44.(YIN Jian-mei,CHENG Wu-qun,YAN Lei,et al.The Model Sands Design of the River Model test of Luan River Reach Through Qianxi County[J].South-to-North Water Transfers and Water Science & Technology,2008,6(2):42-44.(in Chinese))

[6] 杨亚伦,戴梅.南水北调中线滹沱河河工模型试验模型沙的[JP]选择与设计[J].南水北调与水利科技,2010,8(3):17-20.(YANG Ya-Lun,DAI Mei.Model Sand′s Design and Choice of the Hutuohe River Model Experiment in the South-to-North Water Transfer Project[J].South-to-North Water Transfers and Water Science & Technology,2010,8(3):17-20.(in Chinese))

[7] 左东启.模型试验的理论和方法[M].北京:水利电力出版社,1984:2-5.(ZUO Qi-dong.Theory and Method of Model test[M].Beijing:China Water Power Press,1984:2-5.(in Chinese))

[8] 刘丽华,鲁萍.天然河道上溢流坝坝下冲坑成因探讨[J].水利科技与经济,2007,13(6):380-381.(LIU Li-hua,LU Ping.Discussed the Downstream Scour Hole of Spillway on the Natural river[J].Water Conservancy Science and Technology and Economy,2007,13(6):380-381.(in Chinese))

[9] 李炜,徐孝平.水力学[M].武汉:武汉水利电力大学出版社,2000:57-66.(LI Wei,XU Xiao-ping,Hydraulics[M].Wuhan:Wuhan University of Hydraulic and Electric Press,2000:57-66.(in Chinese))

[10] 周玉香,翟召华,季新民,等.低Fr数消能规律研究[J].山东大学学报(工学版),2005,(4):80-84.(ZHOU Yu-xiang,ZHAI Zhao-hua,JI Xin-min.Experimental Study on Low Froude Number Flow[J].Journal of Shandong University(Engineering Science),2005,(4):80-84.(in Chinese))

PDF