South-to-North Water Diversion and Water Science & Technology (南水北调与水利科技) 2011/9:1 PP.156-159

Underground Water Bank Operation Experience of Central Arizona Project and Its Inspiration to the Water Transfer Projects in China


Abstract:
The Central Arizona project (CAP) with its thirty years of operation experience has been a worldwide model for large scale water transfer projects.CAP has a history of over ten years to use underground water bank as a storage reservoir,and exchange water right with the upstream Nevada State.They have rich experience on engineering,techniques,operation and environment protection.The efficiency of underground water recharge was over 99%,and the underground water level kept rising after the recharge,which were good examples for our South-to-North Water Diversion Project.

Key words:underground water recharge,water transfer project,water bank

ReleaseDate:2014-07-21 15:59:16



[1] 郭金敏,田长勋,刘书芳.地下水回灌与再利用[J].资源节约和综合利用,2000,(2):38-39.(GUO Jin-min,TIAN Chang-xun,LIU Shu-fang.Underground Water Recharge and Reuse[J].Resource Saving and Comprehensive Utilization,2000,(2):38-39.(in Chinese))

[2] 张郁,吕东辉.南水北调中线水银行的水合约设计思路初探[J].南水北调与水利科技,2008,6(3):12-14.(ZHANG Yu,LV Dong-hui.Design for Water Contract of 'Water Bank' in the Middle Route of South-to-North Water Transfer Project[J].South-to-North Water Transfer and Water Science & Technology,2008,6(3):12-14.(in Chinese))

[3] Laurent Meillier,Hugo A.Loaiciga and Jordan F.Clark Groun-dwater Dating and Flow-Model Calibration in the Kern Water Bank,California[J].Journal of Irrigation and Drainage Engineering ASCE,2008,13(11):1029-1036.

[4] Timothy O.Erickson and Heinz G.Stefan,Natural Groundwater Recharge Response to Urbanization:Vermillion River Watershed,Minnesota[J].Journal of Water Resources Planning and Management ASCE,2009,135(6):512-520.

[5] Herman Bouwer,Jennifer T.Back,and James M.Oliver,Predicting Infiltration and Ground-Water Mounds for Artificial Recharge[J].Journal of Hydrologic Engineering ASCE,1999,4(4):350-357.

[6] 张猛,成徐州,赵璇.采用组合式强化井灌的人工地下水回灌[J].清华大学学报(自然科学版),2009,49(9):1531-1533.(ZHANG Meng,CHENG Xu-zhou,ZHAO Xuan.Artificial Groundwater Recharge with Reclaimed Water Using Enhanced Direct Injection Well Recharge Seytem[J].Journal of Tsinghua Uinv (Sci & Tech),2009,49(9):1531-1533.(in Chinese))

[7] 张郁,吕东辉.以美国加州为例分析建立南水北调工程“水银行”的可行性[J].南水北调与水利科技,2007,5(1):26-29.(ZHANG Yu,LV Dong-hui.Feasibility of Buliding ′Water Bank′ for the South-to-North Water Transfer Project By Studying California Case[J].South-to-North Water transfer and Water Science & Technology,2007,5(1):26-29.(in Chinese))

PDF